The main challenge of this project was to channel the water discharges from the new bathrooms located in an industrial warehouse that was separate from the main plant, at the same time, integrate the water discharge from the bathrooms located in the old industrial warehouse, resulting in a reception of approximately 100 cubic meters of wastewater per day.

THE SYSTEM DESIGN

The following solutions were implemented:

  • Water Channeling: A slope was manufactured to channel the water, culminating in a pumping station that directs the flow to the treatment plant.
  • Input Flow Measurement: Upon arrival at the plant, a parshall channel was installed to measure the inlet flow, followed by an initial pretreatment zone.
  • Pretreatment System (MyTEER 4.0): In this stage, non-biodegradable solids and sand present in the water was eliminated.
  • Pre-Aeration System (AMS® 4.0): After pretreatment, the water passes through another finer filter.
  • Fine Filtering (SaniTEER 1618): The water subsequently passes through another finer filter.
  • MyFAST® 4.0: In this stage the water with dissolved organic matter comes into contact with the certified brand BioMicrobics sanitary wastewater treatment module, Макет known as FAST Fixed Activated Sludge Technology.
  • Tertiary Treatment: The water is pumped through sediment and activated carbon filters, with chlorine dosage to eliminate remaining contaminants.
  • Storage Tank: Finally, the treated water is stored in a 500 cubic meter tank. From this tank, the water is pumped back to the bathrooms to be reused in the toilets.